IRS-1E was an Earth observation mission launched under the National Natural Resources Management System (NNRMS) programme by Indian Space Research Organisation (ISRO). Sometimes written IRS-P1. The objective of the mission was to develop Earth imagery using instruments carried on board. Due to a malfunction of the launch vehicle, the satellite deviated from its path and plunged into the Indian Ocean.
Names | Indian Remote Sensing satellite-1E Indian Remote Sensing satellite-P1 |
---|---|
Mission type | Earth observation |
Operator | ISRO |
COSPAR ID | ![]() |
Website | https://www.isro.gov.in/ |
Mission duration | 3 years (planned) Failed to orbit |
Spacecraft properties | |
Spacecraft | IRS-1E (P1) |
Bus | IRS-1A |
Manufacturer | Indian Space Research Organisation |
Launch mass | 846 kg (1,865 lb) |
Dry mass | 766 kg (1,689 lb) |
Dimensions | 1.56 m x 1.66 m x 1.10 m |
Power | 415 watts |
Start of mission | |
Launch date | 20 September 1993, 05:12 UTC |
Rocket | Polar Satellite Launch Vehicle (PSLV-D1) |
Launch site | Satish Dhawan Space Centre, First Launch Pad (FLP) |
Contractor | Indian Space Research Organisation |
Entered service | Failed to orbit |
Orbital parameters | |
Reference system | Geocentric orbit (planned) [1] |
Regime | Sun-synchronous orbit |
Perigee altitude | 817 km (508 mi) |
Apogee altitude | 817 km (508 mi) |
Inclination | 98.6° |
Period | 103.0 minutes |
Instruments | |
Linear Imaging Self-Scanning Sensor-1 (LISS-1) Monocular Electro-Optical Stereo Scanner (MEOSS) | |
Earth observation satellites series |
IRS-1E was a follow-up mission to the satellite IRS-1A, to develop India's capability in the field of remote sensing. The satellite was to take up missions in the area of ground-water exploration, land use, forest and flood mapping.[2] The letter "E" indicates that the satellite was an engineering model. The letter "P" (IRS-P1) in the Indian Remote Sensing Programme of Earth observation satellite indicates that the satellite was to be launched aboard a Polar Satellite Launch Vehicle (PSLV).[3] It was launched on 20 September 1993.[4]
IRS-1E carried two instruments:[1]
IRS-1E mission was a failure, as the last stage of the PSLV-D1 malfunctioned, so failed to launch the satellite into its desired orbit. The PSLV was first launched on 20 September 1993, at 05:12 UTC. The first and second stages performed as expected, but an attitude control problem led to the collision of the second and third stages at separation, and the satellite failed to reach orbit.[6] After this initial setback, the PSLV successfully completed its second mission in 1994.[7]
Indian Remote Sensing (IRS) satellites | |||||
---|---|---|---|---|---|
IRS-1 | |||||
IRS-P | |||||
Cartosat |
| ||||
Oceansat |
| ||||
Resourcesat |
|
Indian spacecraft | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||
Satellites |
| |||||||||||
Space probes |
| |||||||||||
Human spaceflight |
| |||||||||||
|
← 1992 · Orbital launches in 1993 · 1994 → | |
---|---|
Kosmos 2230 | Molniya 1-85 | STS-54 (TDRS-6) | Kosmos 2231 | Soyuz TM-16 | Kosmos 2232 | USA-88 | Kosmos 2233 | SCD-1 · Orbcomm CDS-1 | Kosmos 2234 · Kosmos 2235 · Kosmos 2236 | Asuka | Progress M-16 | Gran' No.42L | EKA-1 | UFO F-1 | Kosmos 2237 | USA-90 · SEDS-1 | Kosmos 2238 | Progress M-17 | Kosmos 2239 | Kosmos 2240 | Kosmos 2241 | STS-56 (SPARTAN 201) | Kosmos 2242 | Molniya-3 No.57 | ALEXIS · Orbcomm CDS-2 | STS-55 | Kosmos 2243 | Kosmos 2244 | Kosmos 2245 · Kosmos 2246 · Kosmos 2247 · Kosmos 2248 · Kosmos 2249 · Kosmos 2250 | Astra 1C · Arsene | USA-91 | Resurs-F2 No.9 | Progress M-18 | Molniya-1T No.81 | Gorizont No.39L | Kosmos 2251 | STS-57 | Kosmos 2252 · Kosmos 2253 · Kosmos 2254 · Kosmos 2255 · Kosmos 2256 · Kosmos 2257 | Galaxy 4 | Resurs-F1 No.57 | Radcal | USA-92 · PMG | Soyuz TM-17 | Kosmos 2258 | Kosmos 2259 | USA-93 | Kosmos 2260 | Hispasat 1B · INSAT-2B | Unnamed · Unnamed · Unnamed · SLDCOM-3 | Molniya-3 No.58 | NOAA-13 | Kosmos 2261 | Progress M-19 | Resurs-F1 No.56 | USA-94 | Meteor-2 No.24 · Temisat | USA-95 | Kosmos 2262 | STS-51 (ACTS · ORFEUS-SPAS) | Kosmos 2263 | Kosmos 2264 | IRS-P1 | SPOT-3 · Stella · KITSAT-2 · Itamsat · Eyesat-1 · PoSAT-1 · Healthsat-2 | Gran' 41L | Landsat 6 | FSW-15 | Progress M-20 | STS-58 | Intelsat 701 | Kosmos 2265 | USA-96 | Gorizont No.40L | Kosmos 2266 | Kosmos 2267 | Gorizont No.41L | Solidaridad 2 · Meteosat 6 | USA-97 | STS-61 | USA-98 | Telstar 401 | DirecTV-1 · Thaicom 1 | Molniya 1-87 | |
Payloads are separated by bullets ( · ), launches by pipes ( | ). Crewed flights are indicated in underline. Uncatalogued launch failures are listed in italics. Payloads deployed from other spacecraft are denoted in brackets. |