ViaSat-2 is a commercial communications satellite launched June 1, 2017 and went live late February 2018. It was advertised to be the world's highest capacity communications satellite with a throughput of 300 Gbit/s, succeeding HughesNet EchoStar XIX launched in December 2016.[2] It is the second Ka-band satellite launched by ViaSat after ViaSat-1. The satellite provides internet service through ViaSat (Exede prior to rebranding) to North America, parts of South America, including Mexico and the Caribbean, and to air and maritime routes across the Atlantic Ocean to Europe.[1]
![]() | |
Mission type | Communication |
---|---|
Operator | ViaSat |
COSPAR ID | 2017-029A ![]() |
SATCAT no. | 42740![]() |
Spacecraft properties | |
Manufacturer | Boeing |
Launch mass | 14,110 lb (6,400 kg)[1] |
BOL mass | 6,418 kg |
Start of mission | |
Launch date | June 1, 2017 |
Rocket | Ariane 5 |
Contractor | Arianespace |
Deployment date | June 1, 2017 |
Orbital parameters | |
Reference system | Geocentric |
Regime | Geostationary orbit |
Longitude | 69.9° West |
Transponders | |
Band | Ka-band |
In May 2013, ViaSat gave the construction contract of the satellite to Boeing.[3] On May 1, 2014 ViaSat sold capacity on the satellite to Xplornet Communications.[4][5] In January 2015, ViaSat gave the launch contract to SpaceX in an uncontested auction.[6] After SpaceX CRS-7 exploded after launch in June 2015, concerns arose that the investigation may affect the mission's launch window.[7][8] On February 9, 2016 Arianespace announced it had won contracts to launch ViaSat-2 and ViaSat-3 in 2017 and 2019, respectively.[9]
ViaSat-2 was launched on June 1, 2017 by Arianespace from the Guiana Space Centre in French Guiana.[10][11] The launch date was originally set for April 25, 2017 but was delayed due to social unrest affecting the spaceport area.[12][13] ViaSat-2 successfully arrived in geostationary orbit at 69.9 degrees west longitude on December 5, 2017. The satellite employed a hybrid propulsion approach, using both traditional chemical as well as electric propulsion. The chemical propulsion subsystem was responsible for initial orbit raising and performing according to plan, setting the state for the follow-on ascent to geostationary orbit using electric propulsion, which was completed the last week of November 2017. Viasat spacecraft partner, Boeing Satellite Systems International, controlled and monitored ViaSat-2 throughout the orbit raising process, flying the satellite from its Mission Control Center in El Segundo, California.[14]
The $600 million satellite was intended to have a 300 Gbit/s throughput, up from ViaSat-1's 140 Gbit/s in 2011.[2] It uses Ka-band frequencies.[15]
Problems with two of the four Ka-band antennae, leading to a less optimal coverage pattern than designed [16] have reduced throughput to 260Gbit/s [17]
← 2016 · Orbital launches in 2017 · 2018 → | |
---|---|
January | TJS-2 – Lingqiao / Jilin-1 03 · Caton-1 · Xingyun Shiyan 1 – Iridium NEXT 1–10 – TRICOM-1 – USA-273 / SBIRS GEO-3 – DSN-2 – Hispasat AG1 |
February | Intelsat 32e / SkyBrasil1 · Telkom-3S – Cartosat-2D · INS-1A, 1B · Flock-3p × 88 · Lemur-2 × 8 · Al Farabi-1 · BGUSAT · DIDO-2 · Nayif 1 · PEASS – Dragon CRS-10 – Progress MS-05 |
March | USA-274 / NROL-79 / Intruder 8 – Tiankun-1 – Sentinel-2B – EchoStar 23 – IGS-Radar 5 – USA-275 / WGS-9 – SES-10 |
April | Shijian 13 – Cygnus CRS OA-7 · (ALTAIR · CXBN-2 · IceCube · SG-Sat · SHARC) – Soyuz MS-04 – Tianzhou 1 · SilkRoad-1 |
May | USA-276 / NROL-76 – Koreasat 7 · SGDC-1 – GSAT 9 / South Asia Satellite – Inmarsat-5 F4 – SES-15 – "It's a Test" – EKS-2 |
June | QZS-2 – ViaSat-2 · Eutelsat 172B – Dragon CRS-11 · NICER · Birds-1 (TOKI · GhanaSat-1 · Mazaalai · BRAC Onnesha · Nigeria EduSat-1) – GSAT-19 – EchoStar 21 – Progress MS-06 – HXMT / Insight · Zhuhai-1 01, 02 · ÑuSat 3 – ChinaSat 9A – Cartosat-2E · Aalto-1 · ROBUSTA-1B · Max Valier Sat – Nivelir-ZU (14F150) – BulgariaSat-1 – Iridium NEXT-2 – EuropaSat/Hellas Sat 3 · GSAT-17 |
July | Shijian-18 – Intelsat 35e – Kanopus-V-IK · CICERO × 3 · Corvus-BC × 2 · Ecuador-UTE-YuZGU · Flock-2k × 48 · Flying Laptop · Iskra-MAI-85 · Lemur-2 × 8 · MKA-N × 2 · Mayak · NORSAT-1, -2 · NanoACE · TechnoSat · WNISAT-1R – Soyuz MS-05 |
August | OPTSAT-3000 · VENµS – Dragon CRS-12 · ASTERIA – Blagovest 11L – TDRS-M – Michibiki 3 – Formosat-5 – ORS-5 – IRNSS-1H |
September | USA-277 / OTV-5 – Amazonas 5 – Soyuz MS-06 – Kosmos 2522 / GLONASS-M 752 – USA-278 / NROL-42 – AsiaSat 9 – Yaogan-30-01 × 3 – Intelsat 37e · BSAT-4a |
October | VRSS-2 – Iridium NEXT 21–30 – QZS-4 – SES-11 / EchoStar 105 – Sentinel-5 Precursor – Progress MS-07 – USA-279 / NROL-52 / Quasar 21 – Koreasat 5A – SkySat × 6 · Flock-3m × 4 |
November | BeiDou-3 M1 · M2 – Mohammed VI-A – Cygnus CRS OA-8E · Asgardia-1 – Fengyun-3D · HEAD-1 – NOAA-20 – Jilin-1 × 3 – Yaogan-30-02 × 3 – Meteor-M No.2-1 |
December | Kosmos 2524 – LKW-1 – Alcomsat-1 – Galileo FOC 15-18 – Dragon CRS-13 – Soyuz MS-07 – GCOM-C · SLATS – Iridium NEXT 31–40 – Yaogan-30-03 × 3 – AngoSat 1 |
Launches are separated by dashes ( – ), payloads by dots ( · ), multiple names for the same satellite by slashes ( / ). CubeSats are smaller. Crewed flights are underlined. Launch failures are in italics. Payloads deployed from other spacecraft are (enclosed in brackets). |