SpaceX CRS-22, also known as SpX-22, was a Commercial Resupply Services (CRS) mission to the International Space Station (ISS) that launched at 17:29:15 UTC on 3 June 2021.[1] The mission is contracted by NASA and is flown by SpaceX using a Cargo Dragon 2. This is the second flight for SpaceX under NASA's CRS Phase 2 contract awarded in January 2016.
SpaceX plans to reuse the Cargo Dragons up to five times. Since it does not support a crew, the Cargo Dragon launches without SuperDraco abort engines, seats, cockpit controls or the life support system required to sustain astronauts in space.[2][3] Dragon 2 improves on Dragon 1 in several ways, including lessened refurbishment time, leading to shorter periods between flights.[4]
The new Cargo Dragon capsules under the NASA CRS Phase 2 contract splash down under parachutes in the Gulf of Mexico rather than the previous recovery zone in the Pacific Ocean west of Baja California under the NASA CRS Phase 1 contract.[2][4]
Payload
ISS iROSA 2B and 4B mission patch
NASA contracted for the CRS-22 mission from SpaceX and therefore determines the primary payload, date of launch, and orbital parameters for the Cargo Dragon.[5] The total mission payload is 3,328kg (7,337lb).
First pair of new roll-out solar arrays, using XTJ Prime space solar cells, based on design tested at ISS in 2017. They will be delivered to the station in the unpressurized trunk of the SpaceX Cargo Dragon CRS-22 spacecraft. A second pair will be delivered to the ISS on CRS-26 in late 2022, followed by another pair on CRS-27 in early 2023.[7][8] The installation of these new solar arrays requires two spacewalks: one to prepare the worksite with a modification kit, on 16 June 2021, and another to install the new panel, on 20 June 2021.[9]
Additional hardware carried internally includes:
Catalytic Reactor: legacy unit launching to provide critical sparing support for the water production capability for the environmental control and life support system (ECLSS)
Commercial Crew Vehicle Emergency Breathing Air Assembly (CEBAA) Regulator Manifold Assembly (RMA): completing the first set of emergency air supply capability, this integrated system supports as many as five crew members for up to 1 hour during an ISS emergency ammonia leak
Zarya Kurs Electronics Unit: critical hardware for cosmonaut remote-control docking of Russian spacecraft is launching to support planned maintenance activity during 2021
Potable Water Dispenser (PWD) Filter: major filter assembly used to remove iodine from water consumed by the crew during nominal operations
Commercial off-the-shelf (COTS) Air Tanks: critical disposable air tanks to support gas resupply for routine cabin repress activities in-orbit
Iceberg: critical cold stowage capability to support expanded payload operations [6]
Research
The new experiments arriving at the orbiting laboratory on the SpaceX CRS-22 mission supports science from human health to high-powered computing, and utilizes the space station as a proving ground for new technologies.[10]
Among the investigations arriving inside the Dragon's pressurized capsule will be a variety of research experiments and studies, including:
Develop better pharmaceuticals and therapies for treating kidney disease on Earth
Using cotton root systems to identify varieties of plants that require less water and pesticides
Test new portable ultrasound technology in microgravity (Butterfly IQ Ultrasound) [11]
Two model organism investigations:
One study will look at bobtail squid as a model to examine the effects of spaceflight on interactions between beneficial microbes and their animal hosts
Second study will examine tardigrades' adaptation to the harsh environment of space, which could contribute to long-term problem solving for vaccine production, distribution, and storage on Earth
MIR-SAT1 – Mauritius Research and Innovation Council (MRIC)[19]
G-SATELLITE 2 – OneTeam, Tokyo Organising Committee of the Olympic and Paralympic Games (TOCOG)[20][21]
Returning hardware
The vehicles docked to the ISS prior to the departure of SpaceX CRS-22.
Beginning with returning capsules or lifting bodies under the CRS-2 contract, NASA reports major hardware (failed or expended hardware for diagnostic assessment, refurbishment, repair, or no longer needed) returning from the International Space Station. The SpaceX CRS-22 mission ends on 10 July 2021, this is a two-day delay from the original undocking target of 6 July 2021 as a result of Tropical Storm/Hurricane Elsa causing weather concerns at the splashdown zones,[22] with re-entry into atmosphere of Earth and splash down in the Gulf of Mexico near the western coast of Florida with 2,404kg (5,300lb) of return cargo.
Catalytic Reactor Developmental Test Objective (DTO): developmental environmental control and life support system (ECLSS) unit returning for testing, teardown, and evaluation (TT&E) to determine the cause of failure and subsequent re-flight
Urine Processing Assembly (UPA) Distillation Assembly: critical ECLSS orbital replacement unit used for urine distillation, processing, and future use returning for TT&E and refurbishment to support future spares demand
Sabatier Main Controller: major Sabatier system hardware used in conjunction with the Oxygen Generation System (OGS) for water production needs on-orbit
Rodent Research Habitats (AEM-X): habitats used during Rodent Research missions returning for refurbishment to support future missions in early 2022
Nitrogen/Oxygen Recharge System (NORS) Recharge Tank Assembly (RTA): empty gas tanks returning for reuse to support high-pressure gas operations and activities on-orbit [6]
See also
Uncrewed spaceflights to the International Space Station
"SpaceX Commercial Resupply". ISS Program Office. NASA. 1 July 2019. Retrieved 27 September 2020. This article incorporates text from a publication in the public domain:
"CRS-22 Mission Overview"(PDF). NASA. 27 May 2021. Retrieved 1 June 2021. This article incorporates text from a publication in the public domain:
"ISS Research Program". Glenn Research Center. NASA. 1 January 2020. Retrieved 27 September 2020. This article incorporates text from a publication in the public domain:
Launches are separated by dots (•), payloads by commas ( , ), multiple names for the same satellite by slashes ( / ). CubeSats are smaller. Crewed flights are underlined. Launch failures are marked with the † sign. Payloads deployed from other spacecraft are (enclosed in brackets).
Другой контент может иметь иную лицензию. Перед использованием материалов сайта WikiSort.org внимательно изучите правила лицензирования конкретных элементов наполнения сайта.
2019-2025 WikiSort.org - проект по пересортировке и дополнению контента Википедии